Sone Eastern Link Canal H.E. Project, Barun (2x 1.65 MW)

 

 
line decor
  
line decor

Salient features

 

Sone Canal System is one of the oldest canal system in the country. It is in operation since 1874.

The Sone Eastern Link Canal (SELC) Hydroelectric Project envisages to utilize the existing fall of 3.87 meters on Sone Eastern Link Canal at Km. 10.30(RD 33.80) near its confluence with Sone Eastern Main Canal for generation of Hydroelectric Project.

 

SALIENT FEATURES

 

1.         Catchment areas of Sone river                        :          69000 sq. Km.
            at the Sone barrage

2.         Water Conductor system  
                                          
            a)         Power Channel                                    :           569m.                         
            b)         Tail Race Channel                               :           130m.

3.         Power House                                                  

a) Installed capacity                                         :      2x1.65 MW
b) Head                                                           :       3.87 m
c) Discharge                                                   :       99.12 cumces
            d) Annual Energy Generated              :       19.45 Gwh.

4.         Turbine(s)                                          :         1.8 MW, 120 rpm, Bulb Type
                                                                                 Semi Kaplan,
                                                                                 Horizontal shaft.

5.         Generator(s)                                      :           1692KW, 1880 KVA, 0.9
                                                                                   p.f. 6.6 KV 50 Hz. 120
                                                                                   rpm,  synchronous Generator

***