Sone Eastern Link Canal H.E. Project, Barun (2x 1.65 MW) |
|||
![]() |
|||
![]() |
|||
![]() |
|||
![]() |
|||
![]() |
Salient features
Sone Canal System is one of the oldest canal system in the country. It is in operation since 1874.The Sone Eastern Link Canal (SELC) Hydroelectric Project envisages to utilize the existing fall of 3.87 meters on Sone Eastern Link Canal at Km. 10.30(RD 33.80) near its confluence with Sone Eastern Main Canal for generation of Hydroelectric Project.
SALIENT FEATURES
1. Catchment areas of Sone river : 69000 sq. Km. 2. Water Conductor system 3. Power House a) Installed capacity : 2x1.65 MW 4. Turbine(s) : 1.8 MW, 120 rpm, Bulb Type 5. Generator(s) : 1692KW, 1880 KVA, 0.9 *** |